Captured through Aug 19, 2026, 6:00 PM

Cold Vault Execution Report

One report for what is on the shelf and whether it matches the plan. Pick a measure, drill to the level you own, then work the cold vault.

MEASURING
SCOPE
Banner

Ops track · Facing Fill Rate

Franchise Ops

Reported separately · Facing Fill Rate

No cold vault captures loaded

Weakest categoryNot broken out

Facing Fill Rate by Category for Corporate Ops

Energy · Facing Fill Rate

65%

Facings holding product on the latest capture across the scope.

L7D

66%

-1 pts

Month to date

63%

+2 pts

Year to date

60%

+5 pts

What the captures show

  • 2 SKUs carry most of the gapMonster Java (47%), Rockstar Original (53%) sit furthest below the Energy set in the network, and account for most of the 35 points missing from Facing Fill Rate.
  • Monday 4–8 PM is the worst windowFacing Fill Rate drops 6 points against the weekly average and does not recover until the next delivery.
  • Eye level is where it happensShelves 5 and 2 hold 43% of the deviations in the network, which is where substitutions get made.

Facing Fill Rate by day and daypart · Energy

Each capture carries the day and the hour it was taken, so the same readings cut by window. Opens on Monday 4-8 PM, the weakest window in Corporate Ops.

Weakest: Monday 4-8 PM · 65%
Day6-10 AM10 AM-2 PM2-4 PM4-8 PM8 PM-12 AM
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday

Energy reads 65% facing fill rate on Monday 4-8 PM, 10 points under the all-window average of 75%. 12 facings out of stock across 6 captures inside that window.

Deploy a correction

Drill to a store to deploy against a real cold vault. These are the corrections that fit Facing Fill Rate in Energy.

12,765 stores in scope

Send Precision Pick List

Alternative

SKU, door, shelf and slot in one pass order, so the store team is handed a sequence rather than an instruction to face the cold vault.

Lines

2 SKUs

Est. time

22 minutes

Deploy Targeted Restock Shift

Best fit

A Shiftsmart worker faces the Energy set to plan from back-room stock. Closes only when before-and-after photos pass review.

Shift length

2 hours

Cost

$38

Suggest Corrected Order to Vendor

Alternative

Move Energy to twice-weekly delivery where the set runs dry before the next drop. A restock cannot fix a supply gap.

Cadence

Weekly → Tue + Fri

SKUs

6

Deploy a Centralized Force-Out

Category manager

Push a fixed quantity of Energy to every store in a area or market without waiting for them to order it. For weather, a holiday, or a launch you want on shelf everywhere at once.

Ships to

Store, area or market

Lead time

Next delivery cycle